Tuesday, 23 November 2010
Friday, 5 November 2010
now we've got a roof
the house has got its first coat of render on so at long last we have got rid of the sheets keeping the hemp dry and now the solar panels are up on the south facing roof and the tiles are going on, looking very smart! off to belfast this afternoon to meet the ladies at the northern ireland patchwork group not sure what easy jet will make of six soldering irons in my suitcase!!
Wednesday, 20 October 2010
Important announcement
Tuesday, 19 October 2010
crazy quilts
not my usual style, this quilt was made for a quilt challenge at alveva quilters and will be on show at the alveva quilters exhibition
"an english country garden"
23rd and 24th october at porters barn, grange farm, feltwell - 10am to 4pm - free admission.
enquiries 01760 337181
"an english country garden"
23rd and 24th october at porters barn, grange farm, feltwell - 10am to 4pm - free admission.
enquiries 01760 337181
come along to see all our work and enjoy our fantastic refreshments!
windows and doors
all the windows and doors are in. we have to have a key to get in instead of climbing in through holes in the walls. looks fabulous especially when the sun streams in! now the plasterers have moved in to do the first coat for the render and the roofers are here doing the waterproof roof ready for the sedum blanket.
Wednesday, 13 October 2010
Sunday, 3 October 2010
the flint man came
the 'flint man' came this week and built the panel at the front of the house. the flints had come originally from the pits in brandon. it will provide a link with the old walls and the other flint properties nearby.
although the hemp walls are up and finished they are still very wet and now we seem to have the weather against us, it rains just about everyday and the mornings are now quite misty and damp even on dry days - will the walls ever dry out????
although the hemp walls are up and finished they are still very wet and now we seem to have the weather against us, it rains just about everyday and the mornings are now quite misty and damp even on dry days - will the walls ever dry out????
Friday, 24 September 2010
Tuesday, 21 September 2010
Monday, 20 September 2010
Monday, 13 September 2010
wedding week again
well here we are again - wedding week- we'll be off to poulton le fylde on thursday ready for the nuptials on friday - lets hope the weather cheers up a bit, its cold and wet today. ihope i haven't put on any weight since buying my dress - disaster dharling if it doesn't fit, i won't go into the dress saga here suffice to say its been extremely traumatic. lots of titivating to be done this week - hair, nails etc!
had an interesting day yesterday with secret photographer getting loads of pics of my work and techniques.that's why these images are on show just to remind you of stuff that i produce. watch this space for more news!
lots of activity on the building site, we're hoping the hemp walls will be finished this week - will we get a roof then?
Friday, 10 September 2010
Saturday, 28 August 2010
hemp walls at last
construction of the hemp walls has started. in these pics you can see the hemp and lime being mixed, it looks like paper mache and is a much drier mix than i imagined, once the hemp mix is put in the shuttering it has to be tamped down to compress it - that's what i am doing! it seems to hold together quite quckly which has meant that the shuttering can be moved quite soon although it will take about 4 weeks to dry enough to apply the render so in the meantime the whole house will be wrapped in plastic sheeting.
Tuesday, 24 August 2010
Monday, 23 August 2010
all quiet on the building site
last week was a quiet week on the site with folks on holiday. the electrics are now in - wires everywhere - it looks like a cats cradle. while i've been away the hemp has been delivered ready to start the walls but i think everyone has gone on a 'training' day today - perhaps tomorrow the hemp build will begin? watch this space.
Subscribe to:
Posts (Atom)